Projects
Total Records: 220
-
City of LethbridgeThe Galt Museum & Archives
Sector: Institutional
Categories: Museums and Art Galleries
Disciplines: Mechanical
Region: Alberta
Delivery Type: Design-Bid-Build
The Galt Museum renewal and expansion incorporated a large public, multi-functional space and expanded, environmentally controlled exhibition space enabling greater flexibility for programming and traveling exhibitions concurrent with that of permanent collections. -
Grande Prairie School DistrictMother Theresa School
Sector: Educational
Categories: Elementary School, Secondary School
Disciplines: Mechanical , LEED and Sustainable Design, Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
MCW Hemisphere completed the mechanical and electrical design for this 44,734 sq. ft facility. Mother Theresa School was completed in 2009 and has achieved LEED Silver certification. -
City of EdmontonEdmonton Eskimo Locker Room and Fieldhouse
Sector: Recreational/Sport
Categories: Recreation/Exercise
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
This project was completed in two parts -the first was a new Field House and the second was the Commonwealth Community Recreation Facility. -
Government of CanadaEdmonton Federal Building
Sector: Institutional
Categories: Government, Historical Buildings
Disciplines: Mechanical , Commissioning , LEED and Sustainable Design
Region: Alberta
Delivery Type: Construction Management
This project consisted of a renovation to the historic Federal Building in Edmonton. The restored structure, vacant since 1989, is being used as a government office and meeting space. -
Town of BanffWhyte Museum & Archives
Sector: Institutional
Categories: Museums and Art Galleries
Disciplines: Mechanical
Region: Alberta
Delivery Type: Design-Bid-Build
MCW Hemisphere provided full mechanical engineering services for this expansion project. The addition doubled the size of the museum operations and houses new galleries, administration offices, photo labs and a workshop. -
Alberta InfrastructurePeter Lougheed Visitor's Centre
Sector: Institutional
Categories: Parks
Disciplines: Mechanical
Region: Alberta
Delivery Type: Design-Bid-Build
A significant renovation project completed under the strict guidelines of Government standards, and Provincial Park requirements. The goal was to maintain the feel and design aesthetics. This affected the design throughout including the selection of lighting fixtures that enhance wood structures. -
Regency DevelopmentsThe Pearl Tower
Sector: Residential
Categories: High Rise
Disciplines: Mechanical , LEED and Sustainable Design, Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
The Pearl will be the tallest residential building in Edmonton with 35 stories and 174 units. The Pearl is a redevelopment of a site comprised of 5 residential apartment lots. -
StatesmanGroves of Varsity
Sector: Residential
Categories: High Rise
Disciplines: Electrical, Mechanical
Region: Alberta
Delivery Type: Design-Bid-Build
The Groves of Varsity is a steel and concrete building located in Calgary’s Northwest. The project includes 4 buildings built in phases and was completed in 2015. -
University of AlbertaCameron Library
Sector: Educational
Categories: College & University
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
Cameron Library has more than 350 computers over two floors - the Main Floor and the lower level Knowledge Common and Study Hall. -
Fram Building GroupEast Village - First and Verve Condominiums
Sector: Residential
Categories: High Rise
Disciplines: Electrical, Mechanical
Region: Alberta
Delivery Type: Design-Bid-Build
This exciting residential complex is located on the Bow River between 7th Avenue SE and 5th Street SE. Preliminary plans indicated a total of 6 buildings with approximately 1100 units being planned. -
City of EdmontonNorwood Fire Hall #5
Sector: Institutional
Categories: Fire Stations
Disciplines: Mechanical , LEED and Sustainable Design, Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
The City of Edmonton Fire Hall #5 is currently pending LEED Silver certification. This project included a rainwater recovery system for non-potable water usage. MCW Hemisphere participated both mechanically and electrically in the design of Fire Rescue Station #5 -
Centre for Disease ControlCentre for Disease Control - Building 18
Sector: Laboratories
Categories: High Containment
Disciplines: Mechanical , Electrical, Power System
Region: United States
Delivery Type: Design-Bid-Build
CDC Building 18, the Emerging Infectious Diseases Laboratory, is the premier biocontainment facility of its kind in the world today.