Projects
Total Records: 206
-
SuncorSuncor Business Centre
Sector: Commercial
Categories: Office Buildings – Owner Occupied
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
The Suncor Business Centre is a 100,000 square foot office facility inside a building designed as a warehouse. MCW Hemisphere was responsible for providing design solutions to modify the existing main distribution as well as the fire alarm systems. -
Olds CollegeOlds College Campus
Sector: Educational
Categories: College & University
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
For this mechanical and electrical building systems upgrades and modernization project, Hemisphere provided engineering services for mechanical system upgrades to seven Olds College facility buildings. -
Edmonton Catholic School BoardArchbishop MacDonald High School Modernization
Sector: Educational
Categories: Secondary School
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
MCW Hemisphere provided the mechanical and electrical engineering services for a complete modernization of the existing Archbishop MacDonald High School which originally opened in 1967. -
Kidsland PreSchool Ltd.Luxstone Manor (Airdrie Assisted Living Complex)
Sector: Residential
Categories: Assisted Living
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
This Airdrie Assisted Living facility houses 152 units on 3 floors complete with central and remote Nurse Call systems. -
City of EdmontonMill Woods Twin Arenas
Sector: Institutional
Categories: Ice Rink
Disciplines: Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
Open year round, these twin arenas are 200 ft by 85 ft each and include seating and standing areas for viewing, dressing rooms and concessions. -
Gilead AlbertaGilead Labs Expansion
Sector: Laboratories
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
MCW Hemisphere assumed the role of Prime Consultant providing mechanical and electrical engineering services for the Gilead QA/QC Laboratory Development. Gilead's manufacturing facility in Edmonton, which handles development and manufacturing of investigational drugs, supplies active pharmaceutical ingredients for clinical research programs. -
BECA International Ltd.Cambrian Foothills Health Campus
Sector: Health Facilities
Categories: Medical Centres
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
Originally designed as an office building, a revisit to the design included base building upgrades and the complete fit up to accommodate Networc Health, a major tenant who provides acute health care services. -
University of AlbertaDonadeo Innovation Centre for Engineering (ICE)
Sector: Educational
Categories: College & University
Disciplines: Mechanical , Electrical, Power System
Region: Alberta
Delivery Type: Design-Bid-Build
MCW Hemisphere provided both mechanical and electrical engineering services for design of the core and shell services for a 14-storey office building. -
Alberta Health ServicesWalter C Mackenzie Health Sciences Centre IMRI
Sector: Health Facilities
Categories: Hospitals
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
In addition to MCW Hemisphere completing numerous projects at the Walter C. Mackenzie Health Sciences Centre (WCM) including the original Stollery Children’s Hospital, we have been deeply involved with the WCM from its inception. MCW Hemisphere successfully completed the mechanical and electrical design of the new IMRI within the WCM Surgical Suites. -
Grande Prairie School DistrictMother Theresa School
Sector: Educational
Categories: Elementary School, Secondary School
Disciplines: Mechanical , LEED and Sustainable Design, Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
MCW Hemisphere completed the mechanical and electrical design for this 44,734 sq. ft facility. Mother Theresa School was completed in 2009 and has achieved LEED Silver certification. -
City of EdmontonEdmonton Eskimo Locker Room and Fieldhouse
Sector: Recreational/Sport
Categories: Recreation/Exercise
Disciplines: Mechanical , Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
This project was completed in two parts -the first was a new Field House and the second was the Commonwealth Community Recreation Facility. -
Regency DevelopmentsThe Pearl Tower
Sector: Residential
Categories: High Rise
Disciplines: Mechanical , LEED and Sustainable Design, Electrical
Region: Alberta
Delivery Type: Design-Bid-Build
The Pearl will be the tallest residential building in Edmonton with 35 stories and 174 units. The Pearl is a redevelopment of a site comprised of 5 residential apartment lots.