Sheridan Institute of Technology & Advanced Learning
Sheridan College (Phase 2)

Address (Map): 4180 Duke of York Blvd., Mississauga, Ontario L5B0G5 Canada
Sector: Educational
Delivery Type: P3
MCW Office: Toronto
Sub Categories: College & University

Project Description

The Sheridan College HMC  Phase 2 building is located on a 1.84 acre site north of HMC Phase 1 and connect by an elevated enclosed bridge. The new facility is approximately 185,000 sf to expand Sheridan’s program offering.  The Building will comprise of new teaching space including state-of-the-art classrooms, studio space, and specialized computer labs; a Centre of Creative Thinking intended to facilitate networking and collaboration between students, faculting and industry; faculty office and administrative space; retail space including a bookstore, printing and food services; gallery space to celebrate student creativity and innovation. The  building has  sustainable design including innovative heating, cooling and water systems, etc, for a positive impact to the ecological health of the surroundings building. It is geared for LEED Silver certification. 

x
MCW Logo

Email to MCW Toronto Office

Re: MCW Projects Information Request

Sheridan College (Phase 2)