Design Build

  • Sheridan College (Phase 1)

    This 156,000 sq.ft building located on a 8-acre site is Phase 1 of the New Sheridan College Campus at the City Centre in Mississauga. It comprises a four storey classroom building with ancillary facilities to accommodate the School of Business, The Community Access and Welcome Centre, Literacy Basic Skills/Adult upgrading Program, Language programs and Corporate…

  • Kanata North Recreation Complex

    A major recreation complex to serve the rapidly growing north-western region of the City of Ottawa, offering a range of community and recreation facilities. The project is approximately 90,000 sq.ft and consists of: 25 m, 6-lane pool , leisure pool & facilities, change rooms , 2 full-Size gymnasia , individual conditioning space, meeting & multi-purpose rooms,…

  • Auora and Crowsnest Halls

    These two new residences on the University of Calgary campus were built using the Design-Build method. Aurora Hall is constructed in a triangular and pinwheel configuration. This nine story structure provides the campus with 268 beds. Crowsnest Hall features to towers, one 7 stories and the other 11 stories joined by a common main floor….

  • Rogers Place

    Rogers Place is an exciting initiative between the City of Edmonton and Katz Entertainment Group bringing a world class entertainment facility to the downtown core. Rogers Place serves as home for the NHL Edmonton Oilers, WHL Edmonton Oil Kings, and is a major venue for concerts and other major productions. The capacity for sporting events…

  • Q’ələxən and Həm’ləsəm’ Houses at Totem Park Residence

    These student residence buildings add 567 beds to UBC’s residential buildings, as part of the Student Housing and Hospitality Services strategy to provide 2,500 additional beds on-campus by 2014. This increases the overall student residence spaces to 35% of the full-time student population within that period. This fast-track student residence project provided two new buildings,…

  • Annacis Research Centre

    This new building, adjacent to the Annacis Island Wastewater Treatment Plant, is part of a network of academies to achieve a more sustainable Metro Vancouver. This building focuses on changing the public perception of wastewater. It includes research and lab areas, classrooms, and offices. The goals include attracting and enabling leading-edge academic and applied research,…

  • Burnaby Central Secondary School

    This secondary school boasts a number of sustainable features, including increased energy efficiency (40% over Code), a geoexchange closed loop heating/ cooling system, a weather-regulated irrigation system, durable construction, recycled and regional materials, construction waste management, riparian area restoration, and water-efficient plumbing. Mechanical Systems Description: MCW designed the plumbing and school ventilation and make-up air…

  • The Residence in Mission

    This complex care seniors’ facility houses 200 beds, organized into eight residential “neighbourhoods” of 25 beds each, as well as a day program for other adults. The suites are organized horizontally and stacked over three floors, providing a home-like environment. Constructed almost entirely of wood products, the First Nations-inspired design facilitates integration with the existing…

  • Kipling Integrated Health Centre

    This design-build project entails the construction of an acute care and long-term care hospital, featuring 45 private rooms with 12 acute care beds, 33 long-term care beds and one multipurpose bed. Mechanical Systems Description: MCW provided mechanical designs for complete plumbing systems (including hydronic heating, reverse osmosis, and domestic hot water systems) fire protection systems,…