Electrical

  • RCMP Detachment (100 Mile House)

    This project involved the tender and construction of a new RCMP detachment building, intended to accommodate the expanding needs of the RCMP personnel. The existing detachment was no longer able to meet the needs of its occupants, which had grown to 18 members and nine civilian staff and volunteers; the overflow from the detachment was…

  • Central Alberta Cancer Centre

    The 3810 m2, $65 million expansion at Red Deer Regional Hospital is comprised of a two level addition which included three new Radiation Treatment Vaults and accompanying support space, a CT scanner, laboratories and mechanical and electrical rooms on the Lower Level in addition to a Medical Day Care and Outpatient Clinic on the Upper…

  • Aurora and Crowsnest Halls

    These two new residences on the University of Calgary campus were built using the Design-Build method. Aurora Hall is constructed in a triangular and pinwheel configuration. This nine story structure provides the campus with 268 beds. Crowsnest Hall features to towers, one 7 stories and the other 11 stories joined by a common main floor….

  • BMO Theatre Centre

    Originally named the West First Theatre Centre, this theatre project entailed an infill of an existing double-height space to accommodate a VIP balcony in the lobby and a perimeter catwalk for the theatre. The lobby development also permits pre-show gathering and provide space for live music and a wine bar. Electrical Systems Description: MCW designed…

  • Airside Operations Building

    From emergency response to snow removal and all airside activities in between, the Airside Operations Building (AOB) supports a heightened level of collaboration in order to maintain the highest level of safety for the travelling public and YVR employees. The AOB’s central location allows emergency personnel to respond to any area of the airfield in…

  • Biological Sciences Building LEED Gold Renovation

    This project renovated the 50-year-old, four-storey South and West Wings, providing state-of-the-art lab systems, aquaria, informal research spaces, classrooms, seminar rooms, and gathering spaces for the botany and zoology departments. The energy-efficient systems will save UBC approximately $1 million in utility costs every five years, and drastically reduce its environmental footprint. Construction was completed ahead…

  • Annacis Research Centre

    This new building, adjacent to the Annacis Island Wastewater Treatment Plant, is part of a network of academies to achieve a more sustainable Metro Vancouver. This building focuses on changing the public perception of wastewater. It includes research and lab areas, classrooms, and offices. The goals include attracting and enabling leading-edge academic and applied research,…