Design-Bid-Build

  • Vellore Village Joint-Use Complex

    This educational/recreational complex integrates a new secondary school and community centre within a 35-acre district park. One of the largest projects of its type in Ontario, the $44M complex is designed to maximize the sharing of facilities, yet maintain their own distinctive character and identity for each owner. The building is organized along an interior…

  • Parade (Block 26/29)

    Four Towers on a 10 storey Podium; 2 mid-rise towers with 18 & 21 storeys; 2 high-rise towers with 38 & 43 storeys and a two storeys tall Skybridge – connecting the towers on 33. 35 and 36 floors. Mechanical Systems Description: The mechanical systems include two pipe “change over” vertical fan coils for residential…

  • RCMP Detachment (100 Mile House)

    This project involved the tender and construction of a new RCMP detachment building, intended to accommodate the expanding needs of the RCMP personnel. The existing detachment was no longer able to meet the needs of its occupants, which had grown to 18 members and nine civilian staff and volunteers; the overflow from the detachment was…

  • Central Alberta Cancer Centre

    The 3810 m2, $65 million expansion at Red Deer Regional Hospital is comprised of a two level addition which included three new Radiation Treatment Vaults and accompanying support space, a CT scanner, laboratories and mechanical and electrical rooms on the Lower Level in addition to a Medical Day Care and Outpatient Clinic on the Upper…

  • Allard Hall

    The MacEwan Allard Hall was designed to be a prominent building in the Oliver area of Edmonton and opened September 2017. The building totals approximately 25,000 gross square meters and houses all the arts and culture programs and also includes general multi-purpose instructional space. For Allard Hall, the move from The Jasper Place community into…

  • York House School Senior Building

    This project entailed the design and construction of a new three-storey concrete senior school and administration block, as an addition to the existing school. The new building was constructed between the existing North and South wings. Mechanical Systems Description: MCW provided designs for the HVAC and plumbing systems. The fire protection designs were based on…

  • BMO Theatre Centre

    Originally named the West First Theatre Centre, this theatre project entailed an infill of an existing double-height space to accommodate a VIP balcony in the lobby and a perimeter catwalk for the theatre. The lobby development also permits pre-show gathering and provide space for live music and a wine bar. Electrical Systems Description: MCW designed…

  • Airside Operations Building

    From emergency response to snow removal and all airside activities in between, the Airside Operations Building (AOB) supports a heightened level of collaboration in order to maintain the highest level of safety for the travelling public and YVR employees. The AOB’s central location allows emergency personnel to respond to any area of the airfield in…