Projects
YVR
Airside Operations Building
This building replaces the former 40-year-old fire hall on YVR’s airfield, and consolidates a fire hall, airside operations staff offices, a vehicle maintenance garage, and a storage building at a central airside location. The $43.5-M facility covers an area of 92,850 sq ft/8,626 sqm.
Arts Club & Bart Project Company Ltd.
BMO Theatre Centre
This new home for the Arts Club Theatre Company and Bard on the Beach consists of a complete fit-out of an existing space with a 250-seat theatre, rehearsal halls, costume shops, and offices. Built at a cost of $20,000,000, the theatre is 48,000 sq ft/4,460 sqm in size.
York House School
York House School Senior Building
This project added a new 36,595-sq ft/3,400-sqm senior school and administration block to an existing school. The construction cost was $13,500,000.
City of Edmonton
Rogers Place
Rogers Place is an exciting new initiative between the City of Edmonton and Katz Entertainment Group bringing a world class entertainment facility to the downtown core.
University of Calgary
Auora and Crowsnest Halls
These two new residences on the University of Calgary campus were built using the Design-Build method. Aurora Hall is constructed in a triangular and pinwheel configuration. This nine story structure provides the campus with 268 beds.
Pangman Development
Kelly Ramsey Tower and Enbridge Centre
Destroyed by arson in 2009, the Kelly and Ramsey buildings remained derelict and uninhabited until 2013 when demolition of the historic buildings began The Kelly Ramsey Tower is a new focal point of Downtown Edmonton combining historic podium elements with a new office tower.
MacEwan University
Allard Hall
The MacEwan Allard Hall was designed to be a prominent building in the Oliver area of Edmonton and opened September 2017.
Alberta Health Services
Central Alberta Cancer Centre
The 3810 sq. m, $65 million expansion at Red Deer Regional Hospital is comprised of a two level addition which includes three new Radiation Treatment Vaults and accompanying support space, a CT scanner, laboratories and mechanical and electrical rooms on the Lower Level in addition to a Medical Day Care and Outpatient Clinic on the Upper Level.
RCMP
RCMP Detachment (100 Mile House)
This new, 16,619-sq ft/1,544-sqm RCMP detachment building had a construction value of $5,520,000.
University of Alberta
Donadeo Innovation Centre for Engineering (ICE)
MCW Hemisphere provided both mechanical and electrical engineering services for design of the core and shell services for a 14-storey office building.
Fleming College
Sir Sandford Fleming College Kawartha Skilled Trades Institute
80,000 sq. ft. expansion of Flemming College.