Projects
RCMP Detachment (Golden)
RCMP
This tender and construction of a new RCMP detachment building cost $5,300,000.00. The building is 12,486 sq ft/1,160 sqm.
VPD Headquarters Tenant Improvements and Annex
City of Vancouver
The Vancouver Police Department’s old Main Street headquarters and adjacent annex building underwent extensive tenant improvements. The project cost $3,186,000, modifying 10,000 sq ft/929 sqm of space for the old headquarters and 20,000 sq ft/1,858 sqm of space for the annex.
Burnaby Public Library – Tommy Douglas Branch
City of Burnaby
This LEED Gold-certified library serves Burnaby's Edmonds neighbourhood. The 17,491 sq ft/1,625 sqm building was constructed at a cost of $9,100,000.
Burnaby Central Secondary School
School District 41
This P2 design-build project features an International Standard athletic track and a community meeting hall. The $41-M school is certified LEED Gold.
Cactus Club Cafe English Bay
Cactus Club Cafe
Located in English Bay, this 6,200-sq ft/576-sqm Cactus Club restaurant is certified LEED Gold.
Surrey RCMP Main Detachment Renovations
RCMP
This project entailed tenant improvement work to an existing RCMP detachment building.
Annacis Research Centre
Metro Vancouver
Valued at $9,000,000, this design-build of a wastewater research facility focuses on community outreach and education. The 18,299-sq ft/1,700-sqm building is certified LEED Platinum.
Q’É™lÉ™xÉ™n and HÉ™m’lÉ™sÉ™m’ Houses at Totem Park Residence
UBC Vancouver
Registered REAP Gold under UBC's green building system, these two seven-storey student residence buildings have a combined area of 182,000 sq ft/16,908 sqm and a construction value of $50,122,000.
VPD Property and Evidence Storage Facility
City of Vancouver
This new 97,413-sq ft/9,050-sqm evidence storage facility for the Vancouver Police Department has a construction value of $24,000,000. The facility is currently targeting LEED Gold certification.
Reichwald Health Sciences Centre
UBC Okanagan
This new medical school building, located at UBC`s Kelowna campus, was built at a cost of $31,000,000. The 48,438-sq ft/4,500-sqm building is certified LEED Gold.
Alouette Correctional Centre for Women
Ministry of Justice
This design-build of a new women`s correctional facility is targeting LEED Gold certification. The $34-M facility is 81,900 sq ft/7,609 sqm.
Biological Sciences Building LEED Gold Renovation
UBC Vancouver
This project renovation a 50-year-old university lab building at a cost of $64,000,000. The 182,986-sq ft/17,000-sqm building is certified LEED Gold.