Projects
RCMP
RCMP Detachment (Golden)
This tender and construction of a new RCMP detachment building cost $5,300,000.00. The building is 12,486 sq ft/1,160 sqm.
City of Vancouver
VPD Headquarters Tenant Improvements and Annex
The Vancouver Police Department’s old Main Street headquarters and adjacent annex building underwent extensive tenant improvements. The project cost $3,186,000, modifying 10,000 sq ft/929 sqm of space for the old headquarters and 20,000 sq ft/1,858 sqm of space for the annex.
City of Burnaby
Burnaby Public Library – Tommy Douglas Branch
This LEED Gold-certified library serves Burnaby's Edmonds neighbourhood. The 17,491 sq ft/1,625 sqm building was constructed at a cost of $9,100,000.
School District 41
Burnaby Central Secondary School
This P2 design-build project features an International Standard athletic track and a community meeting hall. The $41-M school is certified LEED Gold.
Cactus Club Cafe
Cactus Club Cafe English Bay
Located in English Bay, this 6,200-sq ft/576-sqm Cactus Club restaurant is certified LEED Gold.
RCMP
Surrey RCMP Main Detachment Renovations
This project entailed tenant improvement work to an existing RCMP detachment building.
Metro Vancouver
Annacis Research Centre
Valued at $9,000,000, this design-build of a wastewater research facility focuses on community outreach and education. The 18,299-sq ft/1,700-sqm building is certified LEED Platinum.
UBC
Q'ələχən and Həm'ləsəm' Houses at Totem Park Residence
Registered REAP Gold under UBC's green building system, these two seven-storey student residence buildings have a combined area of 182,000 sq ft/16,908 sqm and a construction value of $50,122,000.
City of Vancouver
VPD Property and Evidence Storage Facility
This new 97,413-sq ft/9,050-sqm evidence storage facility for the Vancouver Police Department has a construction value of $24,000,000. The facility is currently targeting LEED Gold certification.
UBC
UBC Okanagan Reichwald Health Sciences Centre
This new medical school building, located at UBC`s Kelowna campus, was built at a cost of $31,000,000. The 48,438-sq ft/4,500-sqm building is certified LEED Gold.
Ministry of Justice
Alouette Correctional Centre for Women
This design-build of a new women`s correctional facility is targeting LEED Gold certification. The $34-M facility is 81,900 sq ft/7,609 sqm.
UBC
UBC Biological Sciences Building Renew
This project renovation a 50-year-old university lab building at a cost of $64,000,000. The 182,986-sq ft/17,000-sqm building is certified LEED Gold.